Share
Share
25 September, 2024

New Service Centre in Brazil

September 24th, 2024: Macaé, Brazil – JDR Cables, the global subsea cable supplier and service provider, part of the TFKable Group, has announced a strategic expansion into Brazil where it will open a new service centre in Macaé, located in the state of Rio De Janeiro. The service centre began operations in Q3 2024, providing clients with in-country technical and service support for umbilicals and related equipment, including asset management, repairs and maintenance, and supply of products such as hydraulic jumpers

Brazil is a key market for JDR, with the company already engaged in the provision of high-quality umbilicals and subsea cables for several projects within the country. The opening of the centre is in response to its continued global growth and in-country demand for local support and servicing from customers working across projects in oil, gas, and renewables. The wider Americas are also a key growth region for the business, with JDR holding a strong market share in the United States, supported by its regional headquarters in Houston.

JDR has chosen Macaé to leverage the city’s robust energy infrastructure and skilled workforce. The service centre will commence operations with a local team of experienced Oil & Gas professionals as part of JDR’s regional growth strategy. The facility’s footprint covers 11,265m2, allowing the business to provide a range of services including the management, repair and maintenance of equipment, as well as offshore services, and the assembly and testing of hose jumpers.

In addition to its strong presence in the global oil and gas market, Brazil has committed to tripling clean energy capacity by 2030 and has seen a surge in environmental license requests for offshore wind projects in the country, totalling over 176 GW of potential production. As a result, demand and opportunities for high-quality cables and local servicing are at a high, and growing, level within the country.

Brian Davis, General Manager at JDR Cables, commented on the opening of the facility: “The launch of our new service centre in Macaé reflects JDR’s dedication to addressing the increasing demand for high-quality umbilicals and services in Brazil. It provides us with a first-class facility to support Brazil’s offshore oil and gas as well as wind and broader energy objectives with a sizeable team and room for growth. This allows us to expand upon our strong market share in the region by providing essential technical and service support to our partners in Brazil.”

The centre will be led by locally based Alex Grosso as Operational Manager. A key element of JDR’s strategy is focused on fostering local talent and content, with all skilled employees being locally based. JDR’s existing facility in Houston will also provide support to the Macaé centre through initial training and operational guidance.

Alex Grosso, Operational Manager at JDR Cables, said: “Through our new service facility in Macaé, JDR is investing in local talent and expertise. The centre is staffed by local professionals who have a strong understanding of the Brazilian market, ensuring the delivery of reliable, high-quality services and equipment tailored to meet the needs of our clients.”

Similar articles

6 November, 2024

JDR Celebrates 30 Years of Innovation and Growth.

This November, we celebrate three decades of innovation at JDR Cable Systems, tracing our journey from designing industrial hoses in 1966 to becoming a leader in subsea cable and umbilical technology for the global energy market. Our story, inspired by visionaries like Mr Peter Jacques, began with pioneering umbilical systems and evolved through landmark projects […]

Read more
4 November, 2024

JDR and TFK at ADIPEC 2024

Discover the future of offshore and onshore energy with JDR Cables and TFKable at the EMDAD stand, spanning Hall 2 #2430 to Hall 3 #3130 during ADIPEC 2024. At our stand, explore our cutting-edge #JDR Subsea Umbilicals, Power Cables, and Offshore Services, designed to meet the demands of the global energy industry. Our subsea umbilical […]

Read more
22 October, 2024

Successfull IWOC’s delivery

Last week, the JDR Littleport team successfully shipped eight Intervention Workover Control Systems (IWOCS) umbilicals to a key customer. This milestone marks a significant achievement, as we have been diligently supporting the customer by storing these critical products over the past five months. During this time, our focus on reliability and service has been paramount, […]

Read more
9 October, 2024

JDR at Floating Offshore Wind 2024

Join us at Floating Offshore Wind 2024, taking place from 9th to 10th October 2024, at Stand G21 in Aberdeen. Meet our team: Rory Graham, Mark Braybrooke, Aaron Ellis, Michael Wells, James Young, Joseph Cole, and Joe Francis, and discover how JDR’s innovative cable solutions are shaping the future of offshore energy. Investing in floating […]

Read more
8 October, 2024

JDR Cables at STEMFest24

We’re thrilled to exhibit and support #STEMFest24, a three-day event dedicated to inspiring the next generation in science, technology, engineering, and maths #STEM. Join us on the 8th, 9th, and 10th of October, from 9:30 am to 3:30 pm, at Beacon of Light, Sunderland. Come along and connect with JDR’s #apprentices, Elli Peill and Cory […]

Read more
1 October, 2024

Facility in the heart of Brazil’s Oil&Gas industry

Learn more about JDR’s multi-purpose service center in Macaé, designed to provide in-country support for Umbilicals and other subsea equipment, as well as asset management services. This facility will be host to repair and maintenance operations as well as the manufacturing of jumpers and other small products in Brazil. Strategically located in the heart of Brazil’s […]

Read more
24 September, 2024

JDR at WindEnergy Hamburg

Discover the future of offshore and onshore energy with JDR Cables and TFKable at Hall B5, Stand B5.101 during the WindEnergy Hamburg event. Explore our cutting-edge high-voltage subsea and land cable facility in Cambois, near Blyth, Northumberland. This facility marks a major step in enhancing renewable energy infrastructure, as it will become the first UK […]

Read more
13 September, 2024

Two delegations at Hartlepool Facility

This week, we were thrilled to host two significant visits at our Hartlepool facility! First, we welcomed the RenewableUK industry group, who came to learn about our production capabilities, ongoing projects, and our recent investment in a state-of-the-art high-voltage subsea and land cable facility in Cambois, near Blyth, Northumberland. The group had the chance to […]

Read more