JDR is pleased to announce that the final Array Cable loadout for Equinor’s Hywind Tampen Floating Wind Farm has been completed. The remaining 11km of 630mm2 dynamic cabling including accessories were loaded onto the Normand Vision and JDR will support the termination and testing work once the cables have been installed for the world’s largest floating offshore windfarm to date.
#arraycable #HywindTampen #floatingwindfarm #offshore #Hartlepool #loadout #termination #testing #JDR #TFK.Group